What have you done to your MSP today?

thank you. my buddy is a great photographer,graphic designer etc.

however, he doesn't have a true fisheye, he's got an attachment. no biggie. he just doesn't have the money yet for the actual one.
 
did a full exterior detail, only to have a raccoon lay tracks over my car the following night... and put in new AWR sway bushings....
 
0905092038.jpg


made some eyelids out of vinyl cheap and easy haha
 
Today I replaced my EGR valve. I was going to do the remove, clean, and re-install like in the sticky posted here, but fell into too good a deal on the new oem revised one so I just replaced it. Really improved the idle response.

BUT.... when they tell you it takes 35 minutes don't believe it! You have to remove the strut tower bar, cold pipe, battery (And I removed the plastic mazdaspeed cover & battery tray too) Just to get at the two little 12mm bolts with a breaker bar. Once you've got them loose its no big deal. Total time: 80 minutes.
 
thank you. my buddy is a great photographer,graphic designer etc.

however, he doesn't have a true fisheye, he's got an attachment. no biggie. he just doesn't have the money yet for the actual one.

yeah i noticed its an attachment. but it still looks like fun :)
 
Today I replaced my EGR valve. I was going to do the remove, clean, and re-install like in the sticky posted here, but fell into too good a deal on the new oem revised one so I just replaced it. Really improved the idle response.

BUT.... when they tell you it takes 35 minutes don't believe it! You have to remove the strut tower bar, cold pipe, battery (And I removed the plastic mazdaspeed cover & battery tray too) Just to get at the two little 12mm bolts with a breaker bar. Once you've got them loose its no big deal. Total time: 80 minutes.

raccoons could have done it in 35 minutes without removing anything
 
Ive heard raccoons charge up the ass tho...

s*** not around here. You just leave two full trashcans next to the car with the install parts and a list of what you want done and poof... cheap efficient racoon labor. All done while you dream in your bed.
 
sketched out my new box 2day with my dad, this week hes goin to make demo model out of some cheap ply wood we had laying around for test fitting and experimental purposes and then comes the final model

its gunna be sickkk
 
this is a few days late, but I got my pistons in right before I left town last week. and they are sexy. So the MSP is all starting to come together.
 

New Threads and Articles

Back