Got a bunch done today, not quite to the point where I can fire her up but getting closer. Coolant reroute is basically done (just have to connect the hose to the radiator and extend the temp sensor wiring), starter is on, square top intake mani, injectors/fuel rail, alternator on and belt tensioned, valve cover back on. I have to pick up a nylock type nut for the PS pump bolt tomorrow, then all I have to do is get that together and the belt tensioned, radiator and fans installed, supercharger put back on, coolant filled, vacuum lines connected (installed a EUDM square top intake manifold which has fewer vacuum taps than the US version so I'll have to get creative), new battery installed and the fire her up. Then I just have to fab up a better mount for the MS and do some tuning, and regulate my right foot until the clutch is bedded in.