1.5-5 hours depending on tools and confert level.
just got done took 4.5 to 5 hours. The hardest part for me was getting the old dp out of the car. The bolts i was surprised came out as easy as pie...
Lol, i just got done putting my stock dp back on. The car smoked like a bastard for over 150 miles, i guess i have a bad turbo seal. O well the swap out took only 2.5 hours this time around.
The power was amazing but i couldn't live with the smoke.
Lol, i just got done putting my stock dp back on. The car smoked like a bastard for over 150 miles, i guess i have a bad turbo seal. O well the swap out took only 2.5 hours this time around.
The power was amazing but i couldn't live with the smoke.
Quick question. Did you guys unhook the o2 sensors before taking them out?
I don't know if this is true but I read on another thread somewhere that installing a turbo inlet pipe got rid of the DP smoking problem. I guess you just need to let the turbo breath in both the hot and cold sections.