Some pics form the build
Not a whole lot. I have a very small memory card.
1. Reseating the valves. (should have replaced the seals too...duh)
2. Bored block with new squirters. Those things are a pain to replace. Took 3 hours since we had to invent tools to do it with.
3. New pistons (.025 over)
4. Brand new crank
5. Toga crank bearings going in.
Not a whole lot. I have a very small memory card.
1. Reseating the valves. (should have replaced the seals too...duh)
2. Bored block with new squirters. Those things are a pain to replace. Took 3 hours since we had to invent tools to do it with.
3. New pistons (.025 over)
4. Brand new crank
5. Toga crank bearings going in.