holy crap people don't read. 505zoom stated a while back that the manifolds won't get sent off for powdercoating until they are all done. That way they all get there at once to get coated which makes sense to me.
holy crap people don't read. 505zoom stated a while back that the manifolds won't get sent off for powdercoating until they are all done. That way they all get there at once to get coated which makes sense to me.
No... it has 1/8" NPT for vac ports; and 1/4" NPT for the PCV/BB ports.
-----------------
Heading down to the shop right now to go check out the weekend progress. I hear that the majority of them are done, and that the new fuel rail mount system is awesome. I will snap some pics for you guys while I am there. (rockon)
10 out of 15 are done minus fuel rail mounts. The other 5 should get wrapped up this week. I like the look of the new mounts, so Wes is going to finish one up for me like that this afternoon. Tomorrow I will test fit the part to make sure the new design doesn't cause any issues with getting a wrench on the main flange bolts during install.
If all goes well I will be dropping the manifolds off at the coater next week. (rockon)
The free fuel rail mount looks like some good R&D. I see what you mean about the available space for wrenching or lack there of. Hope everything works out.