- :
- MazdaSpeed 6
Hi Guys!!
Car is 90% done.
that is all..
hehe.
Car is 90% done.
that is all..
hehe.

Hi Guys!!
Car is 90% done.
that is all..
hehe.![]()
So here is a quick picture of my double din install. It is not entirely finished because I think one of the wires must of unsoldered when I was pushing the faceplate in. Anyway the ac works the only problem is I cant switch the center button to turn the air from outside and inside. This will be fixed probably next week. Other then that I just need to get my bypass module so that I could change the display options which are locked right now so that I could select an amber background. Once its fully done ill put up more pics.
So here is a quick picture of my double din install. It is not entirely finished because I think one of the wires must of unsoldered when I was pushing the faceplate in. Anyway the ac works the only problem is I cant switch the center button to turn the air from outside and inside. This will be fixed probably next week. Other then that I just need to get my bypass module so that I could change the display options which are locked right now so that I could select an amber background. Once its fully done ill put up more pics.
Whoa, that looks nice!
so very clean! can you plz detail my car EVENT? lulz.
yer car is begging to be lowered!![]()
Just got a call that the guy who was going to look at the car decided to bail. Oh well...