So, I will document how this goes here. Santos said he will help, undetermined when though. Anyone else? I will start Thurs. most likely. Pics soon on Thurs. of the material. I hope it will be as epic as the Yellow Jacket thread.

So.........my retaining wall materials come Thursday. 300 block, 1 yard Traffic Bond, 2 yards #1 wash stone. See this thread for details.


So..............who's up for helping, and when? I'm off all next week.
 
Last edited:
I have to work all week... and have a full week of training. This weekend is insane also. I need more notice d00d. Sorry, I wish I could help (I still owe you from helping me with all of the soldering last year)

and I am in FL memorial weekend.
 
if you put it off a couple weeks I'd be in. I'm lookin at takin memorial day week off for the hell of it.

Can't do it. It will probably take most of the week. Just some sporadic help with the heavy lifting. I can level s*** on my own. I need help carrying/removing railroad ties, maybe some digging/wheelbarrow action.

I have to work all week... and have a full week of training. This weekend is insane also. I need more notice d00d. Sorry, I wish I could help (I still owe you from helping me with all of the soldering last year)

Consider it training.
 
The only day/time that I can help you is Monday night.... does that work for you?

I'll let you know how far I am at that point. Like I said, it's not really an all day thing any particular day, although I plan to remove most of the ties on Sat/Sun. Come when you can, leave when you have to.
 
I'll let you know how far I am at that point. Like I said, it's not really an all day thing any particular day, although I plan to remove most of the ties on Sat/Sun. Come when you can, leave when you have to.

Alright, i will put it in my schedule!
 
Thanks for combining posts Ross! Confused me for a second though, LOL!

CartmanAuthoritah-thumb.jpg
 
maybe I'll take a couple days off... what the hell. when would be best?

Anytime dude, but probably earlier in the week if you will be labor. If you have experience in this like Santos, maybe a little later in the week to help level, build, etc.

Here is my "tentative" plan, subject to change at any moment.

Thurs., 5/20/10: Get materials, remove fence section, start doing short side wall, and 1-2 level areas (I have a few of these only like 2-4 bricks long).

Fri., 5/21/10: Finish up side wall, this may even run into Sat.

Sat., 5/22/10: Major work starts. Remove back wall. That may take all day. If not, dig trench deeper for traffic bond.

Sun.: Fill trench with traffic bond, which has to be tamped down, and possibly lay 1st course.

Mon. or whatever day works well. Finish up courses while doing backfill every 2 bricks high or so. Wall will be 6 courses high.
 
Last edited:
There are 5 non-work days in there buddy.

This Saturday I'll be either installing sway bars or working in my own yard. Sunday is autox. Next weekend I have autox on memorial day. If I find time either Sat/Sun next weekend I'll let you know!
 
This Saturday I'll be either installing sway bars or working in my own yard. Sunday is autox. Next weekend I have autox on memorial day. If I find time either Sat/Sun next weekend I'll let you know!

How aboot after autoX? I'd be happy to return the favor if you do any work.
 