I can’t use my floor jack on the stock center front point (the dimpled metal plate) because there’s not enough space to pump the lever through the complete range of motion. I’m thinking of using this suspension points, see pictures. One side at a time: lift, jack stand at the pinch weld, repeat on opposite side. Any issues with this plan? Thanks!