well... I spent most of saturday prepping 1145 to have the engine and transmission removed. Pulled accessories, exhaust, wheels, shift linkage, etc. Installed 1145 shift linkage on 935, and prepped my powdercoated linkage for 1145, which was installing all bushings. Ran into an issue.. I have a TWM shifter for 1145, but I have bronzoil bushings. I'm debating selling or trading the TWM for the Kartboy if i can find one.
Sunday morning i removed the engine and trans without a hitch, perfect. Now I'm working on the built motor to prep it with seals and belts and such to be installed. Also engine for 935 is going to be worked on at the same time, to prepare it for install.
Overall quite happy with the progress since I spent MOST of my time cleaning the garage and organizing so I can work out in there, AND work on cars in there. Good stuff.