I dropped her off at the shop again. Getting another pipe made and getting a new BOV and flange welded on because the last one sucked and leaked. Anyway, hopefully by the end of this week everything will be done after about 3 weeks of waiting and headache. All for something I could have done myself if I only had a TIG welder. If all goes well this weekend will be the GTSpec rear cage install and some other fine tweaks plus some much needed detailing. Looks like I'll be just a day or two too late for the MOTM.