S sweetlou69 Member : 2003.5 MSP Mar 20, 2006 #21 well ive got the smic on the way i just need the hotside pipe
T TenaciousB Member : 03 MSP Black Mica #254 Mar 20, 2006 #22 Depending on your time frame, I will have one in two weeks.
S sweetlou69 Member : 2003.5 MSP Mar 20, 2006 #23 well i will be parting out and puttin back together for the next month so ifu have a hot side pipe i will def take it even if its 2-3 weeks
well i will be parting out and puttin back together for the next month so ifu have a hot side pipe i will def take it even if its 2-3 weeks