Finally...............
I emailed K&N on May 14th. Got a call yesterday - they want my MSP.
Monday i'm driving down to Riverside for prototyping. They said it will take 3 days. Oh and hey, i'm getting a 300M from them as a rental
Same day i get it back i'll post dyno results. Currently i have a K&N short ram with heat shield. I will ask them to do 3 different runs (if they agree) - STOCK, SHORT RAM, and COLD AIR.
Hopefully i'll get 3 different dyno sheets.
CANT WAIT !!!
Hope they take good care of my baby.
I emailed K&N on May 14th. Got a call yesterday - they want my MSP.
Monday i'm driving down to Riverside for prototyping. They said it will take 3 days. Oh and hey, i'm getting a 300M from them as a rental

Same day i get it back i'll post dyno results. Currently i have a K&N short ram with heat shield. I will ask them to do 3 different runs (if they agree) - STOCK, SHORT RAM, and COLD AIR.
Hopefully i'll get 3 different dyno sheets.
CANT WAIT !!!
Hope they take good care of my baby.