How to build a retaining wall.

Also, Santos, any idea who might take away old lava rock and landscaping stone? I want to redo my whole landscaping but have all this rock that I don't want to reuse.


to be honest, I am not sure B. yellow page it or put a sign on your driveway for free stone/rock. see if you get any takers.
 
What a day at work. ugh. anyways, E, I asked you not to pay me man. B) I don't like that you cut corners with the drainage pipe. First it looks tacky, you are going to get animals in there and you should have really tiled it to the existing pipe. If you needed help with that I could have helped you again this upcoming weekend. Other than that, it looks great and very nice job on the landscape man.

Not payment dude.....a gift. Accept it, LOL! I have no idea if that drain tile even comes up into the tiered areas on the right side. I wasn't going to dig everything up. Honestly, the drain tile might even be overkill. I think just having the stone up to the top will really help with the drainage. I'll have to check it on a heavy rain and see.
 
Last edited:
Anytime dude, but probably earlier in the week if you will be labor. If you have experience in this like Santos, maybe a little later in the week to help level, build, etc.

Here is my "tentative" plan, subject to change at any moment.

Thurs., 5/20/10: Get materials, remove fence section, start doing short side wall, and 1-2 level areas (I have a few of these only like 2-4 bricks long).

Fri., 5/21/10: Finish up side wall, this may even run into Sat.

Sat., 5/22/10: Major work starts. Remove back wall. That may take all day. If not, dig trench deeper for traffic bond.

Sun.: Fill trench with traffic bond, which has to be tamped down, and possibly lay 1st course.

Mon. or whatever day works well. Finish up courses while doing backfill every 2 bricks high or so. Wall will be 6 courses high.

Guess I should fix this, LOL! And give a summary stat.

Let's see:

Thurs., 5/20/10: Got materials, removed fence section, start doing short side wall removing a few timbers.

Fri., 5/21/10: Rained out

Sat., 5/22/10: Major work starts. Removed back wall with Santos and brother-in-law. That took all day.

Sun.: Cut out 3 buried ties, cleaned up side wall area, started laying base there.

Mon.: Carl and Brian dug out back wall trench, found concrete and re-bar in our way. I finished up side wall.

Tues.: Work continues on trench with Brian and Carl. Cut exposed re-bar and removed more concrete. Filled trench with traffic bond, which was tamped down, and layed 10 bricks of 1st course.

Wed.: On my own (bah). Finished up first course, layed 4 more courses with back fill at each step. Beat the rain (yeah). Felt sick after 12 hours straight.

Thurs.: Brother-in-law and I finished 6th and 7th courses with backfill, finished most of left wing.

Fri.: On own again, finishing right wing.

Sat.: Wife decides to do her own thing pruning bushes, thus not getting dirt backfill done. I made right "rock pond".

Sun: off

Mon: Rained out in the morning making finishing wall 10x harder with mud everywhere. Finished up the dirt backfill, leveled the lower tier (ie. cleaned up all the high spots from dirt that fell when we removed the wall). Transplanted plants, layed 4 yards of mulch.



Materials used:
- 1 yard traffic bond paver base
- 2 yards #1 wash stone
- 330 blocks (30 left over)
- 4 yards mulch
- 4 10 ft. draintile sections
- At least 10 gatorades and gallons of water.
- Culvers, Noodles & Co., Taco Bell, Kopps

Tools:
- 1 wheelbarrow
- Shovels: 2 spade, 1 flat (coal), multiple hand garden trowels, 1 edger
- Rakes: 1 grader, 1 hand
- 6 pair gloves
- Levels: 4 ft., 3 ft. 2 ft., 8 inch, 2 line levels
- 500 ft. line string
- 1 tape measure
- 1 sawzall, 3 metal blades, 2 wood blades
- 1 circular saw with wood and masonry blades
- 1 sledgehammer, 1 regular hammer, 1 rubber mallet
- ~ 10-12 stakes for lines
- Scrap OSB for temporary retaining wall while digging.
- 1 umbrella and stand for shade
- Ant killer
- BB gun
- 1 Homer bucket, 1 regular bucket
- 1 tarp
- 2 ramps
- 2 10 ft. 1/2 conduit with wood screed
- 6 Menards yard waste bags
- Hand pruner and lopper
- Landscape fabric
- 1 dolly
 
Welp. Record rainfalls this year, and wall has not budged at all. Draintile even worked that night it rained 8 inches. I still have to take pics of that lower wall all powerwashed.
 