Ventpod Group Buy Feeler!

Status
Not open for further replies.
Looks like I'll be sleeping on the couch again cause the wife will get on to me but eh, its worth it, count me in to please! Looks like a great product and again thanks for putting in the time to do this.
 
Count me in. So, is it going to be available at therpmstore on the 4th possibly then?

Hey everyone! My tooling supplier is making the last two molds today (we've made 10 molds so we can make parts faster) and then he starts pouring plastic. I should have samples later this week.
Again, the timing is running a bit over, but I do not want to put something out there that is sub-par. We've made some additional corrections to the tools to up the quality of the parts.
As far as ordering from RPM, as long as Donny gives his approval of the product everyone will be placing their orders through TheRPMStore. ;)

Hold tight!
 
I just picked up the last of the engineering samples yesterday. I need to send two of them to Donny at RPM, which I'll do Monday morning. I have every confidence that he'll like what he sees. The parts look great! In fact, I've given the supplier the go-ahead to start production, so when Donny approves, I'll have the quantities already on hand to ship to him. :)

We're knockin' on the door, folks!! ;)
 
Sorry everyone i have been extremely tied up the last few weeks. I have done a horrible job at keeping the interested list updated. I have also replied to all the PM's. Sorry for the delay
 
WHOA I was just telling my friend today I wish something like this existed!! Interested count me in.
 
Sorry everyone i have been extremely tied up the last few weeks. I have done a horrible job at keeping the interested list updated. I have also replied to all the PM's. Sorry for the delay

Wasn't the original intent of the 'interest list' to see if you could reach your break even number? I would say you are WAY past that. ;)

You might start another list for 6 owners, though.
 
Yes, 100 was the magic number. ;)

For you 6'rs...here's a pic of one of the first prototypes....
 

Attachments

  • DSC01311.webp
    DSC01311.webp
    61.6 KB · Views: 148
  • DSC01311_avatar.webp
    DSC01311_avatar.webp
    2.5 KB · Views: 305
I just picked up the last of the engineering samples yesterday. I need to send two of them to Donny at RPM, which I'll do Monday morning. I have every confidence that he'll like what he sees. The parts look great! In fact, I've given the supplier the go-ahead to start production, so when Donny approves, I'll have the quantities already on hand to ship to him. :)

We're knockin' on the door, folks!! ;)

sweetness
 
I raced through this thread because I was so pumped over the concept ... are these ramped up to production or we still waiting for first production lot to start/completed???

Thanks
 
My guy is running the first batch right now. ;)

I've sent two samples to Donny at RPM for his review/approval. Once he gives the green light, I'll be ready to send him his first batch which he will then make available to youz guyz. ;)
 
sorry, i dont feel like looking through like 30 pages, did you ever have an idea of the price ? if its reasonable i would deffinitly get one !
 
Status
Not open for further replies.

New Threads and Articles

Back