Hi all, I've been mentioning pieces of my install in various threads so I thought I would concetrate the topic to a single thread...I had this week off so I made great progress.
Components
Stock Head Unit (for now)
KnuKoncepts Wires, Terminals, and Interconnects
MTX Thunder 302 (75x2) for highs
MTX Thunder 500d (500x1) for lows
Eclipse 8062 6.5" Components
ImageDynamics ID8d2v3 subwoofers (2).
First step was to run the wiring...I did that a few weeks ago. All KnuKoncepts.
Second step was to install the speakers in the doors. Stock locations for now.
And now I'm on step three, the subwoofer box.
The box is a trapazoid shape and will fit up against the rear seat. It is for 2 8"s so it is very small depth and height wise. I finished the box on tuesday, and fabricated mdf rings and started on my first layer of fiberglass today. The photos show all. I stapled black fleece to the box for the first layer. I will be pulling the staples out once I am ready to start sanding. Before anyone asks, the ports in the photos have not been cut yet, they will be about 12" long when all is said and done. I plan to sand, bondo, sand, sand some more, and paint it silver. I have black vinyl for the trim pieces.
Comments welcome as usual. I am done for the week but I will be working on it again next week. I will post pictures here as it progresses.
Components
Stock Head Unit (for now)
KnuKoncepts Wires, Terminals, and Interconnects
MTX Thunder 302 (75x2) for highs
MTX Thunder 500d (500x1) for lows
Eclipse 8062 6.5" Components
ImageDynamics ID8d2v3 subwoofers (2).
First step was to run the wiring...I did that a few weeks ago. All KnuKoncepts.
Second step was to install the speakers in the doors. Stock locations for now.
And now I'm on step three, the subwoofer box.
The box is a trapazoid shape and will fit up against the rear seat. It is for 2 8"s so it is very small depth and height wise. I finished the box on tuesday, and fabricated mdf rings and started on my first layer of fiberglass today. The photos show all. I stapled black fleece to the box for the first layer. I will be pulling the staples out once I am ready to start sanding. Before anyone asks, the ports in the photos have not been cut yet, they will be about 12" long when all is said and done. I plan to sand, bondo, sand, sand some more, and paint it silver. I have black vinyl for the trim pieces.
Comments welcome as usual. I am done for the week but I will be working on it again next week. I will post pictures here as it progresses.