It's getting there. I finally got my replacement big brake surfaces (12" x 1 1/4" thick) and started drilling and heating the bolts holding the hats to the rotors so I can swap them out for the new ones. Got one side done but I need new hardware. Halfway done the other side.
After that it's kind of a short list but still time consuming.
Put together the front end and replace a bolt that's missing in the shift linkage.
Remove the whole exhaust after the turbo and have my buddy weld a 90 degree downpipe for now so I can get it running. After it moves I'll drive it to his shop and we'll work up some kind of side exit race exhaust. Hopefully through the bumper or fender.
Finish plumbing and wiring the water to air intercooler setup. I started this but haven't finished.
Get a blow off valve flange welded onto the water to air intercooler.
Hook up all the fittings on the turbo, take old gas out, change oil and coolant, flush the brakes, and fire her up. I also have to replace the accessory belt since I cut it when I removed the AC system.
Once it runs (hopefully very well) I need to get new tires and then I will get the exhaust finished and get inspection and registration. Then I can start enjoying her.